Deviated Septum

Aesthetic & functional improvement!
Curved nose rhinoplasty

One choice, MINE Plastic Surgery

SCROLL

Simultaneous aesthetic & functional septal curvature improvement

MINE Deviated Septum Surgery Info

Surgery Time

Within 2 hours

Anesthesia

Sleeping/Local

Daily Activity

Within 1 week

Treatment

1 Session

Discharge

Day of Surgery

MINE

MINE

MINE

Deviated Septum
Rhinoplasty

A deviated septum bending towards one side
is not visually appeasing and can cause nasal disorders
such as nasal congestion and chronic headaches.
Therefore it is beneficial to correct it with deviated
nose rhinoplasty. MINE Plastic Surgery can
improve the deviated septum along with functional
aspects. We make space for the implant size in the
nasal bone membrane and then insert the
implant. With tight fixation the bridge does not
curve or move and is safely higher and straighter
than before.

#curved nose rhinoplasty in Korea
#deviated septum

Female after with straight nose after correcting deviated septum.

MINE

Deviated Nose Surgery Key Points

MINE PLASTIC SURGERY

01

Prevent future deviations of
the nose

02

Ideal angle and height for the face

03

Simultaneous improvement
aesthetically and functionally

Why is MINE Deviated Septum
Rhinoplasty special?

Custom make the implant to each case and improve the
deviation from the outside and inside!

Deviated Septum Nose — Special Reason

Type of Deviated Septum

Straight septum case without deviated septum.

Straight from the start
of the bridge to the nose tip.

Deviated Septum in a S curved shape.

C shape curve
from middle to tip
of the nose

S shape curve

from start to middle to tip
of the nose.

Curved in different directions

Deviated Septum in a diagonal line.

Deviated in one direction
from start to tip of the nose

Who needs
deviated nose rhinoplasty?

  1. 01 If face is unbalanced due to a deviated nose
  2. 02 If nose is often stuffy and is experiencing related conditions
  3. 03 If nostrils are deviated
  4. 04 If the implant is deviated
  1. 01 If face is unbalanced due to a deviated septum
  2. 02 If nose is often stuffy and is experiencing related conditions
  3. 03 If nostrils are deviated
  4. 04 If the implant is deviated

Deviated Nose Surgery Method

If nose is slightly deviated

Insert cartilage or dermis in the curved area
to make the bridge less deviated.

Slightly deviated septum.
Correcting deviated septum by adding cartilage.

If nose is severely deviated

Correct the sepal cartilage

Do osteotomy on the curved septal bone and cartilage.
Resposition so that it is straight.

Severely deviated septum.
Severely deviated septum is corrected through osteotomy.
Safety First

Safety System
applies to all patients,

Safety System
applies to all patients,

The start of plastic surgery
is orderly safe process.

Dedicated Medical Staff

All process from consultation to surgery to post-op care is managed through our medical staff to ensure satisfying results.

Surgery Observation Deck

The guardian can observe the surgery from the observation room with the patient's agreement .

On Board Anesthesiologist

On board anesthesia specialist will control the anesthesia and monitor the patient's vitals always prepared for all possible situations .

hospital-introduction-safe-anaesthesia-system-mo

Safe Anesthesia System

Monitoring device, UPS system, oxygen supplier, body temperature maintenance, 3D CT, sterilization system, air shower system .

Premium After Care

We provide post-op care services to improve scar pigmentation, post-op pain management and anti-inflammatory treatment, and laser treatment for faster cell restoration.

First Aid System

Dantrolene and heart defibrillator are prepared for safety measures. All medical staff and employees receive education regularly regarding first aid care and safety protocol.

MINE YOUTUBE

Learn more about breast surgery through our videos

  • She is STAR 🌟  #shorts #star #doublechin
    MINE Plastic Surgery
    She is STAR 🌟 #shorts #star #doublechin
  • Find your hidden jawline with Mini neck lift and double chin surgery. #shorts #plasticsurgery
    MINE Plastic Surgery
    Find your hidden jawline with Mini neck lift and double chin surgery. #shorts #plasticsurgery
  • Chin fat removal surgery #shorts #cuind #chinfatremoval #doublechinremoval
    MINE Plastic Surgery
    Chin fat removal surgery #shorts #cuind #chinfatremoval #doublechinremoval
  • She is STAR 🌟  #shorts #star #doublechin
    MINE Plastic Surgery
    She is STAR 🌟 #shorts #star #doublechin
  • Deep neck fat removal explained. #thickneck #saggingskin #skinremoval #fyp #viralvideo
    MINE Plastic Surgery
    Deep neck fat removal explained. #thickneck #saggingskin #skinremoval #fyp #viralvideo
  • Who needs this surgery?  #thisyou? #check #shorts #thickneck #neckfat #plasticsurgery
    MINE Plastic Surgery
    Who needs this surgery? #thisyou? #check #shorts #thickneck #neckfat #plasticsurgery
  • Male double chin surgery. #stubbornfat #neckfat #removal #beforeafter #shorts
    MINE Plastic Surgery
    Male double chin surgery. #stubbornfat #neckfat #removal #beforeafter #shorts
  • Deep neck fat surgery for thick necks #shorts #thickneck #neckfat #plasticsurgery
    MINE Plastic Surgery
    Deep neck fat surgery for thick necks #shorts #thickneck #neckfat #plasticsurgery
  • What is Titanium Lifting Laser? | MINE Dermatology Korea
    MINE Plastic Surgery
    What is Titanium Lifting Laser? | MINE Dermatology Korea
  • Where did the fat go? 😕🧐  #shorts #results #necklift
    MINE Plastic Surgery
    Where did the fat go? 😕🧐 #shorts #results #necklift
    • 15
    • 14
    • 13
    • 12
    • 11
    • 10
    • 9
    • 8
    • 7
    • 6
    • 5
    • 4

    Before & After

    Surgery results may vary depending on individual circumstances.

    Before & After
    Why Patients Choose MINE
  • No search results found
  • Caution Unauthorized use of the post above may result in legal sanctions for infringement of copyright and portrait rights.
    This image may look different from the actual patient depending on the shooting conditions, and it was posted with the patient's consent.